MANUFACTURING
Manufacturing Permits
Manufacturing Services — Approvals, Compliance & Facility Upgrades
From light manufacturing to last-mile logistics, we align DOB, FDNY, DEP, and DEC so your facility stays productive and compliant.
Use & Layout Changes
Change-of-use, storage mezzanines, racking, loading, egress, accessibility.
Mechanical & Ventilation
Process exhaust, dust collection, make-up air, specialty ventilation.
HazMat & Fire Protection
HPM review, sprinklers, alarms, CO₂, flammables storage, FDNY permits.
Environmental Compliance
Noise/air, oil/waste storage, DEP/DEC coordination and sign-offs.
How SLK Keeps Production Moving
- Feasibility: Confirm use groups, load profiles, and required upgrades.
- Filings: ALT/MEP/SPR/FDNY packages with code-cited responses.
- Inspections: Coordinate DOB/FDNY/DEP/DEC; close punch lists.
- Ongoing compliance: Set renewals and logs for fire and environmental permits.
Work with NYC Agencies (18)
Disclosure: SLK Buildings is a private consulting and construction-management firm and is not affiliated with NYC DOB, HPD, HCR, or any government agency.
We provide zoning analysis, code compliance analysis (code interpretation), violation resolution, design with our partner Registered Architect, DOB filings, permit expediting, and construction coordination.
SLK BUILDINGS Inc.
212.888.3888 | [email protected]
295 Madison Avenue, 12th Floor, New York, NY 10017
Monday to Friday: 10.00 am – 5.00 pm (by appointment)