Home > Department of Buildings Table of Contents > Obtaining a Permit > Permit Application and Filing
A NYC DOB permit application involves submitting the required construction job filing and, when the project reaches the appropriate stage, a separate request for an issued work permit. A job filing is not itself a construction permit. The correct route, responsible signers and documents depend on the proposed work and whether the job is in DOB NOW: Build or a legacy Buildings Information System (BIS) record.
For work-specific authorizations, use the published DOB Permit Types directory. The Obtaining a Permit Parent covers the broader process, while this page focuses on filing responsibilities and submission steps.
When planning the filing for a school, clinic or factory, review the Community Facilities guide and Manufacturing Projects guide. These are property-specific explanations, not substitutes for the process steps on this page.
A permit application starts with identifying the correct job filing and work type. On plan-based projects, the Applicant of Record describes the scope, prepares or coordinates the required drawings and submits the job filing. Once DOB reaches the applicable approval stage, an eligible permit applicant requests the work permit. A project may need more than one work-type permit.
Keep separate records for the job filing number, any associated work-permit numbers, approval status and the people responsible for each. A filing confirmation or approved plan does not authorize unpermitted construction.
DOB NOW: Build handles many current job filings, supporting document uploads, electronic signatures, objections and permit requests. Review the specific work type and current module instructions before beginning. Job filings created in DOB NOW: Build do not appear as jobs in BIS.
Some older or specified applications remain associated with BIS and eFiling. Review the existing job record and DOB instructions for the exact application. Do not create a new DOB NOW job simply because an older permit does not appear in its public portal. Search both systems when investigating a property with a filing history.
For ordinary plan-based construction applications, the Applicant of Record is a New York State Registered Architect or licensed Professional Engineer, collectively called a Registered Design Professional (RDP). The RDP submits the job application, drawings and required professional declarations. The owner and other listed stakeholders complete their own required attestations.
The work-permit applicant is a different role. DOB states that a filing representative may perform permitted data entry, but cannot submit a work-permit application on behalf of the authorized permit applicant. Applicable contractors and licensed trade professionals submit or hold permits based on the work type. DOB identifies a limited owner-as-applicant option for General Construction (GC) permits; do not extend that rule to every trade.
A required-documents list is generated from the specific filing. Do not assume every DOB application requires every document, or that a document is waived because it does not appear on an older checklist.
DOB NOW provides a separate permit-request stage after the relevant job-filing tasks. The permit applicant must complete that request and satisfy its conditions before an issued permit can be printed.
Check the BIS job number, filing status, permit history and the DOB eFiling instructions that still apply to that record. Some legacy permits use eSubmit, uploaded forms or separate procedures for renewals and changes. DOB periodically changes the accepted submission path, so use the current official legacy instructions rather than an old paper checklist.
For disapproved legacy applications, the RDP may need revised plans, an explanation responding to objections and an appointment when required. Preserve original approvals and transaction evidence while resolving the outstanding review items.
A DOB NOW combined filing can include only the work types DOB permits to be combined, and its included work types require the same Applicant of Record. DOB distinguishes that job-filing arrangement from a composite work permit: the same contractor must perform the work types included on one composite permit.
A combined filing does not obligate every work-type permit to be composite. Where trades use different qualified contractors, separate work-type permits may be appropriate. DOB does not allow General Construction and Plumbing to be combined as one GC filing merely for convenience; check the particular work-type combination rules.
For the distinction between combined job filing and a single composite work permit, see the Combined General Construction Composite Permit (GC-CX) guide, while checking the DOB rules for the project’s actual contractor arrangement.
SLK Buildings may assemble available building and application records, coordinate document requests and stakeholder follow-up, and maintain an action list for the owner, RDP, contractor and filing team within an agreed scope. SLK does not replace the licensed applicant, perform regulated design work or submit documents requiring another person’s legal authorization.
No. Confirm the required job approval and issuance of each applicable work permit before starting regulated construction.
DOB allows administrative data entry by filing representatives, but the legally authorized permit applicant must submit the applicable permit request.
Only permitted work-type combinations may be combined, and the same Applicant of Record is required across those work types. Composite permits have separate same-contractor conditions.
Review BIS and the associated eFiling records. For newer DOB NOW jobs, use DOB NOW: Build and the public portal.
Property owners, managers and project teams may need to determine whether proposed construction requires a DOB work permit, who is authorized to file, and when the Department can issue the relevant authorization. A job application, approved construction plans and an issued work permit are separate records. Work may also involve different contractors and permits for different trades.
NYC DOB administers construction job filings, plan review, work permits and associated inspections within its authority. Depending on the property and work, other agencies may separately oversee fire protection, environmental issues, right-of-way activity or operating conditions. A DOB permit does not replace another agency’s approval.
SLK Buildings may assist within its agreed consulting and construction-management scope by organizing existing DOB records, coordinating questions for the appropriate architects, engineers and contractors, and tracking pending document requests and agency responses. Registered Design Professionals and licensed contractors retain their legal responsibilities; DOB controls permit decisions.
Useful preparation includes the property address, current building use, DOB job and permit numbers, existing approved plans, description of the new work, responsible contacts and any open objections or required documents. These records help clarify what is known and what must be resolved next.
For property-specific services, explore Residential, Commercial, Community Facility and Manufacturing. Permit and professional requirements still depend on the actual work.
For a project-specific discussion, identify the property, proposed work and any existing application or permit number. Contact Us or Request a Proposal to describe the assistance sought. A defined agreement establishes scope, responsibilities and fees.
Disclaimer: SLK Buildings is a private consulting and construction-management firm, not affiliated with NYC DOB or any government agency. Information is educational, not legal, architectural, engineering or other licensed-professional advice. Qualified providers must perform regulated services. Agencies control their decisions; SLK does not guarantee permits, plan approvals, inspections, sign-offs or outcomes.