Expediting and Violations Fee Schedule

FILING AND APPROVAL OF JOB APPLICATIONS (PROFESSIONAL CERTIFICATION) ~ Project-Based Fee

  • Prepare DOB filing documents
  • Obtain signatures from building owner’s, if required
  • Pre-file and Filing Alteration 2 or Alteration 3 – Self Certification application
  • Obtain job application approval

FILING AND APPROVAL OF JOB APPLICATIONS (REGULAR PLAN EXAMINATION) ~ Project-Based Fee

  • Prepare DOB filing documents
  • Obtain the owner’s signature, if required
  • Pre-file and Filing Alteration 2 or Alteration 3 – Plan Examination application
  • Attend up to 2 (two) Plan Examination appointments
  • Discuss the objection(s) with the applicant of record
  • Obtain job application approval
SIGN-OFF JOB APPLICATIONS (DIRECTIVE 14) ~ Project-Based Fee

  • Submit documents for items required
  • Sign-Off job application
  • Submit PW7 – request for Certificate of Completion (Sign Off)

SIGN-OFF JOB APPLICATIONS (NON-DIRECTIVE 14) ~ Project-Based Fee

  • Submit documents for items required
  • Sign-Off work types
  • Sign-Off job application
  • Submit PW7 – request for Certificate of Completion
OTHER SCOPE OF WORKS:

  • Obtain work permit (not included the contractor’s fee) ~ $ 200.00
  • Reinstatement application for jobs filed less than 2 years ~ $ 300.00
  • Reinstatement application for jobs filed more than 2 years ~ $ 500.00
  • Resolving SEP Audit ~ $ 800.00
  • Appointments with Plan Examiner ~ $ 300.00
  • Appointments with Borough Manager ~ $ 300.00
  • Appointments with Borough Commissioner ~ $ 500.00
  • Attend DOB inspection for alteration 2 job application ~ $ 500.00
  • Attend DOB inspection for alteration 1 job application ~ $ 800.00
  • Attend DOB inspection for New Building job application ~ $ 1,500.00
  • Obtain Temporary Certificate of Occupancy ~ Project-Based Fee

DOB and ECB Violations Removal ~ See NYC Violations
FDNY ~ FIRE DEPARTMENT EXPEDITING

  • Fire Alarm expediting services ~ Project-Based Fee
  • Ansul/Fire Suppression expediting services ~ Project-Based Fee
  • Cryogenic Gas Storage Permit expediting services ~ Project-Based Fee
  • FDNY Violations Removal ~ See NYC Violations 

DEP ~ DEPARTMENT OF ENVIRONMENTAL PROTECTIONS EXPEDITING

  • Site Connection Proposal expediting services ~ Project-Based Fee
  • SD1&2 sewer expediting services ~ Project-Based Fee
  • Installation of new/relocated hydrant expediting services ~ Project-Based Fee

Notes: The fee schedule stated above are estimates only. We have the right to change the fees at any time without notice.

We accept Cash, Credit Cards, Checks, Zelle, Venmo, PayPal and Money Orders for payment

Fee Schedule